Novashop Projekt crew on site — morning toolbox talk

Service · Crews

Crews & labor subcontracting

Qualified crews for general contractors — drywall, paint, masonry, concrete — with a crew lead and written responsibility.

Approach

Labor subcontracting is not "people rental". We put a crew on site with a defined scope, a crew lead, a quality log, and a clear responsibility line. The GC does not have to coordinate each tradesman individually.

We scale both ways — from a two-man trade crew to a twelve-person combined team. Everything is on a written contract, including safety protocols, insurance, and MTR registration.

Workflow

Stages for labor subcontracting to a general contractor.

  1. Scope and interview

    The GC defines scope, trade, programme, and site location. A first call confirms the right crew composition.

  2. Crew composition

    Crew lead + tradesmen + support agreed in writing. CVs, MTR status, and insurance are forwarded before mobilization.

  3. Contract and safety sign-off

    Subcontract with responsibility lines, rates, and programme. Safety induction before mobilization.

  4. Mobilization

    Crew arrives on the contract date. The crew lead signs in with the GC site manager before first hour.

  5. Work and reporting

    Crew lead issues a weekly report to the GC: completed quantities, quality notes, next-week plan.

  6. Scope acceptance

    Signed acceptance at the close of each scope. Warranty and documentation travel with it.

Labor discipline

In labor subcontracting, discipline — not tools — decides the outcome.

  • MTR registration

    Novashop OÜ is listed in the Estonian Register of Economic Activities. The crew lead provides the status with the first document pack.

  • Liability insurance

    Contractor liability insurance in force on every site. Policy is forwarded to the GC before mobilization.

  • Site safety

    Safety routine aligned with ISO 45001 principles — daily toolbox talk, PPE audits, written incident log.

  • Qualifications

    Trade qualifications (drywall, paint, masonry) archived and forwarded on request.

What the GC receives

  • A crew lead accountable for every tradesman on the line
  • Weekly written report (quantities, quality, risks)
  • Liability insurance policy on day one
  • Document pack: MTR, insurance, qualifications
  • Flexible scaling in both directions (2–12 people)
  • One written contract, not a "handshake"

Fixed quote, no advance

Send us a project brief

Scope, site address, target start — a short brief is enough. Fixed-price quote back within one business day.

Get in Touch
Novashop Project

Preparing your experience

Loading…0%
Get in Touch