
Service · Masonry
Masonry & stone works
Load-bearing and decorative masonry — brick, block, and natural stone — without schedule-driven shortcuts.
Approach
Masonry is one of the few trades where speed does not improve the result. Mortar mixing, brick wetting, corner and level checks — these are not formalities. They are the reason a wall lasts fifty years rather than cracking within ten.
We work to both traditional craft principles and modern system assemblies (e.g. formed-block multi-wythe façades). The choice follows material, load, and architectural intent — not habit.
Workflow
Six stages from substrate to the last joint.
Substrate check and prep
Foundation level check, damp-proof course installation, anchor-point set-out.
Material intake
Brick or block batch verification: dimensions, moisture, colour tone. Bricks laid out by producer batch to prevent streaking.
First course
The first course sets the wall. Plumb, true, correct joint — it takes longer than the next five courses combined.
Rise and reinforcement
Course by course with bed-joint reinforcement, anchored to structure per design.
Pointing and finish
Fresh-mortar pointing, face washed with acid solution where needed. Colour and pigment chosen before cure, not after.
Final acceptance
Plumb check with a 2 m straightedge, diagonal verification, joint uniformity. Recorded.
Materials and standards
Brick and block
Wienerberger, Columbia, or local Aeroc depending on thermal and load requirements. Brick intake by batch, always.
Mortar
Cement–lime mix per wall type. Factory mixes (Quick-Mix, Sakret) where batch stability is critical.
Reinforcement
Bed-joint mesh every 2–3 courses per the structural design. Corner anchorage with separate rebar.
Plumb tolerance
Load-bearing ±3 mm per 3 m; decorative façade ±2 mm per 3 m. We aim to beat these rather than hit them.
What you receive at handover
- Masonry as-built drawings (plans and sections)
- Material DoPs (brick, block, mortar)
- Reinforcement protocol by layer
- Plumb and diagonal acceptance record
- Twelve-month written warranty plus five-year load-bearing warranty
Selected work

Façade · Harjumaa · 2023

Load-bearing wall · 2024


Fixed quote, no advance
Send us a project brief
Scope, site address, target start — a short brief is enough. Fixed-price quote back within one business day.
Get in Touch