Published May 26, 2026
Q1, Q2, Q3 or Q4: which drywall finish level your project actually needs
The finish level does not come from an Estonian standard, it comes from the contract. Q1 to Q4 written out the way they behave on site, in the program and at handover.
10 min read
Who defines the finish levels
The finish levels Q1 to Q4 are not an Estonian national standard. The Knauf Estonia material says so outright: the quality levels Q1 to Q4 for finishing plasterboard surfaces were developed by Eurogypsum, the European gypsum industry association, together with UEEP, the union of finishing contractors. It is a joint system of manufacturers and finishers, not a regulation.
The practical consequence is simple. No Estonian legal act known to us says that a corridor wall has to be Q3. The level is set by whoever writes the works description: the designer, the cost consultant on the client side, or the main contractor's scope text. If nobody writes it, the level does not exist in the contract, and what applies instead is the chapter below on a contract that names no level.
Knauf recommends exactly this to whoever drafts the contract. The manufacturer page states that in order to avoid disagreement between client and contractor over the end result, it is sensible to set the quality requirements precisely through surface quality levels. That is advice about contract text, not an installation instruction for the tradesman.
The same page adds the other half, the half a scope is usually missing: finishing contracts and works descriptions define the properties of the surface to be finished and its quality level. Properties and level are two separate lines. The level alone does not say what goes on top of the surface, and that is exactly what decides whether the level was chosen correctly at all.
Q1 to Q4, one after the other
Each level contains the one below it. What follows tracks the definitions on the Knauf Estonia filler page.
Q1 is the technically necessary level. Board joints are filled with compound and, where needed, joint tape, and visible screw heads are covered with compound. No optical requirements for smoothness or appearance apply to a Q1 surface. Q1 suits a surface that will be covered with ceramic or decorative tile, and it serves as the base for the next coat.
Q2 is standard filling. On top of Q1 comes a second coat, applied so that the transition from one board to the next is smooth; the same requirement covers fixings, internal and external corners and the edges of movement joints. Q2 suits matt paints, coarser-textured wall coverings and decorative renders with a grain above 1 mm. No tool marks and no compound residue may be left on the surface.
Q3 is standard filling plus wide filling over the joint zones and a thin skim across the whole board face that fills the pores. The levelled surface is sanded as required. Q3 suits thin wall coverings, matt paints and decorative renders with a grain up to 1 mm.
Q4 is a full skim. The joints and the entire board face are covered with an even 1 to 3 mm coat of compound and, where required, the sanded and dried surface receives one further thin coat. Q4 is the flattest level and suits smooth and glossy wall coverings, mid-sheen paints and decorative finishing compounds.
| Level | What gets filled | What the level sits under |
|---|---|---|
| Q1 | Joints with compound and tape where needed, visible screw heads | Ceramic or decorative tile; base for the next coat |
| Q2 | Q1 plus a second coat with a smooth transition between boards | Matt paint by long-pile roller, coarse-fibre wallpaper, decorative render above 1 mm |
| Q3 | Q2 plus wide joint filling and a thin skim across the whole face | Thin wall covering, matt paint, decorative render up to 1 mm |
| Q4 | The whole face in an even 1 to 3 mm coat, plus a thinner second coat if needed | Smooth or glossy wall covering, mid-sheen paint, decorative finishing compound |
Which level for which room
The name of the room is not the basis for choosing a level, it is shorthand. The manufacturer ties the level to the finishing material: to what goes on top of the compound and how much light that surface throws back. A room-type table works only when every row carries with it the finish the level was meant for. Without that, the table is an opinion.
Two rules override the table. First: where the surface will be covered with ceramic tile, the Knauf instruction is to fill the joints only, and to avoid sanding and filling beyond the joint zone. A higher level here is money that disappears under the tile. Second: on a multi-layer construction with a fire resistance requirement, the joints of the lower board layers must also be filled with compound, without joint tape and without covering the screws. That work is not part of the level of the visible surface and belongs in the scope as a separate line.
The third factor is light, and it outweighs room type often enough to have earned its own chapter.
| Surface on site | Typical level | Why that one |
|---|---|---|
| Walls to be tiled, plant rooms, riser walls | Q1 | The surface is covered by tile and no optical requirement arises; beyond the joint zone there is no filling and no sanding |
| Stores, ancillary rooms, service corridors | Q2 | Matt paint by long-pile roller; joint shadows in raking light are accepted at this level |
| Offices, common corridors, hotel and apartment rooms | Q3 | A thin covering or matt paint across a large even surface; the shadows are weaker and less extensive than at Q2 |
| Feature areas, wall-washed walls, surfaces facing a glazed facade | Q4 | A glossier finish and sharp raking light give a surface defect away immediately |
The light picks the level
Raking light is what exposes the difference. Compound shrinks as it dries, so a flat surface covered evenly with fresh compound pulls into a shallow hollow over the joint. In direct light it is invisible; in sharp raking light the eye reads the hollow as a shadow. Knauf describes this mechanism explicitly at Q2 and states that Q3 reduces the strength and extent of the shadowed areas rather than removing them.
At Q4 the message is blunter still. According to Knauf, filled surfaces that are completely even and free of shadow under light falling from the side are not technically achievable. Which means a shadow-free wall is not an enforceable contract requirement at any level. What is enforceable is the level, the finishing material, and the lighting under which the surface is accepted.
The same page adds a warning that gets ignored on site constantly: where a surface was levelled under LED work lighting alone, with no account taken of daylight, visual differences caused by light and shadow may appear later. Knauf recommends dealing with the lighting question during the filling works and, where necessary, adjusting the choice of the planned raking light source or the direction of its beam.
For the scope that means three lines: which finish goes on the surface, what its sheen is, and under which light handover takes place. A wall-washer or a floor-to-ceiling window makes a corridor a Q4 case even when the room-type table says Q3. And the other way round: an interior in matt paint with no raking light does not need Q4 in order to be sound.
When the contract names no level
When the contract names no level, the gap does not stay empty. Clause 4.9.1 of the general conditions of building contracts ETU 2013 states that where the contract sets no more specific quality requirements and none follow from legislation either, the contractor shall carry out the works, having regard to the circumstances, to at least average quality, and shall follow good building practice.
Average quality is not a number. The subcontractor prices it as Q2, because that is the market default. The designer on the client side had a Q3 surface in mind, because there is a wall-washer on that wall. Neither is lying and neither knows the assumption of the other. The difference surfaces at handover, under the client's own light, once the surface is already painted.
From there the ETU 2013 machinery is formal. Clause 4.9.5 gives the client five working days from discovery to give notice of non-conformity, allowing a reasonable period for remedy. Clause 4.9.7 states that in a dispute over quality or quantities the parties shall arrange control measurements or tests within five working days at the latest, in the presence of the representatives of both parties; unless agreed otherwise the contractor arranges them and gives three working days of notice.
But a control measurement cannot agree a level that was never agreed. It can only compare the surface against what the contract says. If the contract says filling and painting, then at least average quality is what gets measured, and the dispute ends not in a measurement but in a negotiation where both sides hold a defensible position.
The cost is asymmetric. Raising the level after painting is not a repair but a new cycle: priming, filling, sanding and repainting across the whole surface group. A patch repair shows up under exactly the light that found the defect, so a partial solution does not technically exist.
Novashop settles this on the contract side, not on site. The level is fixed in the scope before the first coat, surface group by surface group, together with the finishing material and the handover lighting. The quote is fixed and the contract written, work starts with no advance payment, and the filling stage is accepted against a checklist before the painter starts. A change of level is then a visible variation rather than a difference of opinion discovered at handover.
The level and the program
A higher level is not the same work done better. It is more coats, more drying and more sanding passes. Q1 to Q2 adds a second coat over the joints and the fixings. Q2 to Q3 adds wide joint filling and a thin skim across the whole board face. Q3 to Q4 adds a 1 to 3 mm skim and, where required, one more thin coat after sanding.
Every coat has to dry before the next one. Knauf notes separately that the drying time of ready-mixed dispersion compounds is governed by the temperature and humidity of both the surrounding air and the substrate, and that the temperature and humidity conditions on site affect the final quality of the work. Drying is calendar time. It is not accelerated by putting more people against the wall.
Priming falls in between. Knauf recommends priming the surface to be filled in order to even out the different absorbency of board and compound and to secure adhesion, and adds that to avoid disagreement it is sensible for the necessary prior priming to be done by the same party that does the filling. In the program that means the primer is a line of its own, not the painter's first day.
The third effect is dust and sequence. Sanding does not run in parallel with many other trades in the same zone. The higher the level, the more times the zone has to be closed to others, and the more the completion date depends on sequence rather than speed. A change of level therefore always travels with a change to the program, and it belongs in the milestone matrix before the fact, not after.
Getting the level into the tender
Tenders become comparable when every bidder prices the same surface to the same level. The seven lines below are the scope language that achieves it. They belong in the works description, not in a covering letter and not in the minutes of a site meeting.
With those seven lines you can lay three tenders side by side and see why one is cheaper. Without them, the cheapest tender is usually cheaper for one reason: it priced a lower level, and the difference comes back at handover, where somebody else pays it.
Seven lines that make filling a priceable item:
- 01The level per surface group rather than per project: Q1, Q2, Q3 or Q4 against each room type or wall group, with a reference to the quality level system and to the manufacturer document the levels are read from.
- 02The finishing material and its sheen for each surface group. A level is verifiable only together with what goes on top of it.
- 03The lighting under which the surface is accepted: daylight together with the designed lighting, not the site work lights. If there is a wall-washer on the wall, it is named here.
- 04Excluded surfaces: walls that disappear behind tile stay at Q1, with a note that beyond the joint zone there is no filling and no sanding.
- 05Priming: who primes, with which primer and at which stage, so that evening out the absorbency does not fall between two contractors.
- 06Multi-layer constructions as a separate line: filling the joints of the lower board layers on a wall with a fire resistance requirement is not part of the level of the visible surface.
- 07Stage acceptance: the filled surface is accepted against a checklist before painting, and only then does the next stage begin.
Sources
Frequently asked questions
What is the difference between Q2 and Q3 filling?
Q2 is standard filling: joints, screw heads and corners get a second coat so the transition between boards is smooth. Q3 adds wide filling over the joint zones and a thin skim across the whole board face that fills the pores. Shadows in raking light stay possible at both levels, but at Q3 they are weaker and less extensive.
What is Q4 filling and when do you need it?
Q4 is a full skim: the joints and the entire board face are covered with an even 1 to 3 mm coat and, where required, one further thin coat after sanding. You need it under smooth and glossy wall coverings, mid-sheen paints and on walls in sharp raking light. According to the manufacturer, no level delivers a completely shadow-free surface.
Do plasterboard joints have to be taped?
Yes, from Q1 onwards: joints are filled with compound and, where needed, joint tape, and visible screw heads are covered with compound. The exception is a multi-layer construction with a fire resistance requirement, where the joints of the lower board layers are filled with compound but no tape is applied and the screws are not covered. A joint that stays visible always gets tape.
How do you get a straight plasterboard wall?
Straightness comes from the framing, flatness from the compound. A level does not correct a crooked frame: the Q4 skim is 1 to 3 mm and it will not compensate for stud deviation. So the agreement comes in two parts, the permitted deviation of the framing and the surface quality level, and both belong in the works description rather than in a verbal arrangement on site.
Which filling level suits matt paint?
Matt paint by long-pile roller carries a Q2 surface. If the wall is large, even and takes raking light, Q3 is safer, because it reduces the strength and extent of the joint shadows. Light and paint sheen decide this, not the name of the room. Glossier paint and smooth wall coverings call for Q4.
Does Estonia have its own standard for filling levels?
We hold no evidence of an Estonian national standard stating which room needs which level. Levels Q1 to Q4 were developed by Eurogypsum and UEEP, and they apply on site when the contract refers to them. Where the contract names no level, ETU 2013 sets at least average quality instead.
Who is liable when the level is not in the contract?
Liability resolves through average quality and good building practice, which is an interpretation rather than a measurement. Under ETU 2013 the client gives notice of non-conformity within five working days, and in a dispute control measurements are arranged within five working days. A measurement compares the surface only against the contract, so the outcome is decided by what was written into the scope.
Fixed quote
Send the finishing schedule or the room list
We write the level out surface group by surface group and quote a fixed price per level. Written contract, no advance payment, stage-by-stage acceptance.